Maksons limited provides structural steel fabrication in 48 Glentham road is responsible for planning and implementing the production, delivery, and assembly of structural steel.

Client: HARRIS CALNAN LTD

Weight of total steel: 63 tons.

Number of steel: 143

Days of installations: 3 Week

The services our structural division performs include:

  • Site meeting with Client, Architect, and Structure engineer.
  • Site survey before starting drawing.
  • Fabrication and supply of structural steel-work
  • Accurate Site setting out with help of GPS survey.
  • The delivery by Hiab.
  • Installation by crane and cherry picker.
  • Full site installation by the professional and experienced installation team.