Crescent Parade - Hillingdon

STEEL STRUCTURAL BALCONY AND GLASS BALUSTRADE

Maksons limited provides structural steel fabrication in CRESCENT PARADE,

HILLINGDON, UB10 0LG is responsible for planning and implementing the production, delivery, and assembly of structural steel balcony and glass balustrade.

Client: Kelly Contractors UK LTD

Weight of total steel: 15 tons.

Number of steel: 30

Days of installations: 1 Week

The services our structural division performs include:

  • Site meeting with Client, Architect, and Structure engineer.
  • Site survey before starting drawing.
  • Fabrication and supply of structural steel-work
  • Accurate Site setting out with help of GPS survey.
  • The delivery by Hiab.
  • Installation by crane and cherry picker.
  • Full site installation by the professional and experienced installation team.

Date
Jan 2019
Location
Hillingdon, London, UK
Services
Structures